Wednesday, May 30, 2007

Site visit #6 Building under construction.

























Site: Ryrie St, Geelong. "Harrison Place".
Construction type: Bondek concrete flooring system.
Analysis: The Bondek formwork can be seen here. Bondek is a permanent formwork in which the concrete is poured onto it and left as is. The Bondek is fixed to both the the steel universal beams and precast concrete wall (shown) with metal cleats.

No comments: